Scheduled maintenance
Sequence loads to turbine teams during defined maintenance and inspection campaigns.

Wind-farm logistics
Aerial delivery for upland wind farms and remote renewable assets, moving tooling, service components and maintenance supplies across the access problem.
THE ACCESS PROBLEM
Remote turbines often sit beyond slow tracks, access gates and weather-exposed ground. LIFTGRID connects a safe logistics base with the work front so high-value technicians are not used as porters.
MISSION TYPES
Each example is a route to qualify, not a blanket promise to fly.
Sequence loads to turbine teams during defined maintenance and inspection campaigns.
Move a correctly packed replacement part when a return journey would extend lost generation time.
Bypass weak, closed or environmentally restricted access sections from a prepared staging area.
Support multiple controlled locations with a documented rotation, battery and cargo plan.
TYPICAL CARGO
Every item needs verified mass, dimensions, packaging, lifting points, value and dangerous-goods status.
01Maintenance tooling
02Packaged replacement components
03Cable and electrical fittings
04Diagnostic equipment
05PPE and consumables
06Outage support kits
The route is designed around terrain rather than following the track network.
The commercial case improves when the same approved route supports multiple lifts.
Aerial delivery can reduce load carrying across steep or saturated ground.
ROUTE QUALIFICATION
We need enough evidence to test both operational fit and commercial value.
Known maintenance programme
Cargo within the verified usable payload
Landowner and wind-farm coordination
Prepared staging and receiving areas
Measurable technician, vehicle or downtime value
Turbine or work-front coordinates
Maintenance schedule and lift sequence
Load list with verified weights
Existing vehicle route and journey time
Site safety and emergency contacts
SECTOR FAQ
The launch service is focused on controlled ground or winch delivery near the work front. Lifting directly to a nacelle would require a separate, much more demanding engineering and authorisation case.
DJI publishes a 12 m/s take-off and landing wind-resistance figure, but LIFTGRID will use lower mission limits where the route, suspended load or authorisation requires it.
It can be if delay cost is high, but planned multi-lift maintenance routes usually produce the strongest economics.
Send the cargo, coordinates, frequency and access alternative.
Assess this route