Slope and hillside works
Move compact loads between a safe compound and a difficult work face.

Construction drone lift
Aerial lifting for construction, civil engineering and environmental projects where cranes, tracks or manual handling are disproportionate to the load.
THE ACCESS PROBLEM
Small, repeated loads can wait behind larger plant, ground preparation and access constraints. LIFTGRID provides a specialised lift option for defined materials and controlled project sites.
MISSION TYPES
Each example is a route to qualify, not a blanket promise to fly.
Move compact loads between a safe compound and a difficult work face.
Reduce repeated vehicle movements across sensitive or weak ground.
Supply bridges, water assets and isolated civil works from a measured staging location.
Deliver labelled loads in the order required by the site team and lifting plan.
TYPICAL CARGO
Every item needs verified mass, dimensions, packaging, lifting points, value and dangerous-goods status.
01Tools and test equipment
02Packaged fixings and fittings
03Cable and pipe components
04Environmental materials
05Survey and monitoring equipment
06Project consumables
Subject to safe staging, receiving and containment areas.
The handover method is selected around the worksite.
The drone operation interfaces with the principal contractor's site controls.
ROUTE QUALIFICATION
We need enough evidence to test both operational fit and commercial value.
Controlled construction site
Principal contractor coordination
Defined repeated load list
Clear crane or access alternative
Safe exclusion and receiving zones
Site logistics plan
Lift locations and elevations
Cargo schedule and packaging
Existing lifting operations
Site induction and emergency arrangements
SECTOR FAQ
No. It can replace selected small or awkward logistics movements where a crane, telehandler or road is disproportionate. The route assessment compares the options.
Cargo must be contained, weighed and engineered for flight. Loose material is not accepted.
The operating plan will normally create controlled areas and keep uninvolved people outside the relevant ground-risk footprint.
Send the cargo, coordinates, frequency and access alternative.
Assess this route